Barrel Union Replacement Program

The barrel union replacement program involved the removal and replacement of multiple barrel unions or dismantling joints which had been identified as posing a risk of failure.

HPP completed the works within allocated shutdown times to ensure no disturbance to the bulk water network in the Brisbane area