- HPP completed commissioning and testing of the landers shute stage 2 pipeline on time prior to its network integration. HPP worked alongside major infrastructure contracts to deliver our combined projects
- Heaton Plant and Pipeline can carry out your vegetation management, reinstatement and bank stabilization works
- Project: refurbish 1800mm valve. Project required the 1800mm valve to be removed and a spool fabricated while the valve was refurbished. Critical infrastructure was shutdown operating only on emergency supply whilst the work was carried out, delivered on time, without incident
- Fabrication and installation – irrigation meters
- Lockyer creek flood repairs. Following the floods of 2011 and 2013, HPP provided flood repair and rectification solutions to many catchment areas, weirs and pumpstations including removal of debris, clearing of silt and sediment at weir sites and many other areas. HPP has also undertaken many projects to stabilize embankments and catchment areas
- LSWTP Stage 2 pipeline. Construction of flowmeter pit including design,and construction of the pit and civil works as well as the installation of the 600mm magflow flowmeter
- Civil – Dam safe access construction. HPP provide civil construction services which included works on dam walls, spillways and associated structures including access roads and tracks, fall restraint and prevention, structure protection and energy dissipators
- Pipeline repair and maintenance. LSWTP stage 2 testing, commissioning and repairs. The project involved hydrotesting, acoustic leak detection and leak repair along with all other associated works such as full reinstatement
- Atkinson Dam NRV valve installation. Supply and install a new NRV and carry out pipe and concrete modifications
- Image Flat CWR1. HPP Adapted new valves into a very fragile existing pipeline system
- Service water off take pipeline Installation of a new 200mm PE service water pipeline
- Logan river flood repairs. HPP have been engaged to carry out bank stabilization and flood repair works to many sites throughout queensland incuding methods such as rock placement, concrete, Gabion mattress and basket and vegetation establishment
- Release valve access. This project involved design,fabrication and installation of aluminium walkways to provide a safe access across blasted rock to release valves and measuring weirs
- Security upgrade project. Fabricate and install security gates and fences to multiple sites
- New chemical dosing line installation. Over 1000m of new chemical dosing lines were installed within an “outer shield“ line/hose to prevent the risk of a future leak contacting personnel